🗣️ Preamble:

GTM Priority 1: Solving the chicken-and-egg problem faced by new crypto exchanges

GTM Priority 2: Getting maximum validation with the least amount of time. Be Scrappy!

To achieve maximum validation with minimal engineering effort and build-out time, we've devised a phased approach:

This phased approach allows us to validate our concept, build a user base & momentum early on, and start iterating quickly based on user feedback, all while minimizing initial engineering overhead and time-to-market.

More details below on the phased approach: 🚀Sequential Releases / Points Campaign - In Detail

The Importance of the Asian Trading Market